← Back to this chapter

The build diaries · Photographed in 2016–2017

Building the Mitchell shop and workshop

The Mitchell build, from the early rooms and retail displays to the fitted workshop. Follow the framing, lining, paint, shelving, benches and finishing touches in date order.

136 photographs · From the first steps to the finished space

ContainerMitchellTuggeranong
See the fitted space ↓Start at the beginning
Jump to a stage 7 stages
The premises and the existing workshop — February–April 2016Building a compact room — May–June 2016The first retail display walls — July–August 2016Extending the fitout and building the timber ceiling — September–November 2016Lining, painting and services for the workshop — May–June 2017Flooring, benches and workstations — June 2017The sign and the finished workshop — July 2017

Follow the photographs in date order, or choose a stage. Select a photo to enlarge it and move through the sequence.

01The premises and the existing workshop — February–April 2016

The blue Mitchell shopfront, before the later signs and displays.
00117 Feb 2016

The blue Mitchell shopfront, before the later signs and displays.

A timber partition takes shape beside existing wiring and wall panels.
00218 Mar 2016

A timber partition takes shape beside existing wiring and wall panels.

A narrow passage runs alongside the partly enclosed work area.
00318 Mar 2016

A narrow passage runs alongside the partly enclosed work area.

Containers and new partitions share the warehouse space.
00418 Mar 2016

Containers and new partitions share the warehouse space.

The existing repair bench, already surrounded by tools and parts.
00518 Mar 2016

The existing repair bench, already surrounded by tools and parts.

Rows of parts bins show how the existing workshop was organised.
00618 Mar 2016

Rows of parts bins show how the existing workshop was organised.

Tools and supplies fill the end of the repair bench.
00718 Mar 2016

Tools and supplies fill the end of the repair bench.

A view of the existing equipment rack and cabling.
00818 Mar 2016

A view of the existing equipment rack and cabling.

A timber floor and bare wall record the space before more fitting out.
00926 Mar 2016

A timber floor and bare wall record the space before more fitting out.

Posters begin to fill the blue shopfront windows in April.
0108 Apr 2016

Posters begin to fill the blue shopfront windows in April.

02Building a compact room — May–June 2016

The compact room begins as exposed timber framing above a bare floor.
01127 May 2016

The compact room begins as exposed timber framing above a bare floor.

An outside view records the new framing beside the existing container door.
01227 May 2016

An outside view records the new framing beside the existing container door.

Wall studs and ceiling joists define the long, narrow room.
01327 May 2016

Wall studs and ceiling joists define the long, narrow room.

Wall lining starts to cover the exposed framing.
01427 May 2016

Wall lining starts to cover the exposed framing.

More wall panels are fitted while the ceiling framing remains exposed.
01527 May 2016

More wall panels are fitted while the ceiling framing remains exposed.

Lining progresses along the side of the room.
01627 May 2016

Lining progresses along the side of the room.

The doorway and wiring are visible during the lining work.
01727 May 2016

The doorway and wiring are visible during the lining work.

Insulation starts filling the spaces between the wall studs.
01828 May 2016

Insulation starts filling the spaces between the wall studs.

Insulation and new lining meet partway along the wall.
01928 May 2016

Insulation and new lining meet partway along the wall.

Wall panels cover more of the framing, with insulation still visible above.
02029 May 2016

Wall panels cover more of the framing, with insulation still visible above.

Horizontal timber pieces are fitted across the partly lined wall.
02129 May 2016

Horizontal timber pieces are fitted across the partly lined wall.

Ceiling lining starts covering the exposed joists.
02229 May 2016

Ceiling lining starts covering the exposed joists.

The ceiling is almost covered, with a strip still open at the side.
02329 May 2016

The ceiling is almost covered, with a strip still open at the side.

Lights are on as the last ceiling edges are finished.
02429 May 2016

Lights are on as the last ceiling edges are finished.

The doorway from outside shows how the new room sits beside the existing structure.
0257 Jun 2016

The doorway from outside shows how the new room sits beside the existing structure.

The room is now fully lined and lit.
0267 Jun 2016

The room is now fully lined and lit.

Joints and trim remain visible before painting.
0277 Jun 2016

Joints and trim remain visible before painting.

The room is masked and prepared for finishing.
0288 Jun 2016

The room is masked and prepared for finishing.

A further view records the wall preparation before the final paintwork.
0299 Jun 2016

A further view records the wall preparation before the final paintwork.

White paint changes the feel of the narrow room.
03012 Jun 2016

White paint changes the feel of the narrow room.

Carpet replaces the exposed timber floor.
03112 Jun 2016

Carpet replaces the exposed timber floor.

A desk goes into the far end of the room.
03213 Jun 2016

A desk goes into the far end of the room.

The fitted corner desk completes this stage of the room.
03313 Jun 2016

The fitted corner desk completes this stage of the room.

03The first retail display walls — July–August 2016

Bare timber studs mark out the next area to be fitted out.
03423 Jul 2016

Bare timber studs mark out the next area to be fitted out.

Insulation is fitted partway across the display wall.
03523 Jul 2016

Insulation is fitted partway across the display wall.

The first wall is filled with insulation.
03623 Jul 2016

The first wall is filled with insulation.

Black membrane starts covering the insulated wall.
03723 Jul 2016

Black membrane starts covering the insulated wall.

The membrane now spans the first wall.
03823 Jul 2016

The membrane now spans the first wall.

Insulation work moves around the adjacent wall.
03923 Jul 2016

Insulation work moves around the adjacent wall.

The next wall is filled before the membrane goes on.
04023 Jul 2016

The next wall is filled before the membrane goes on.

Black membrane encloses more of the retail corner.
04123 Jul 2016

Black membrane encloses more of the retail corner.

A view through the entrance glass shows the work still underway inside.
04223 Jul 2016

A view through the entrance glass shows the work still underway inside.

The membrane-lined area is seen together with the entrance.
04324 Jul 2016

The membrane-lined area is seen together with the entrance.

A delivery of slatwall panels waits to be fitted.
04427 Jul 2016

A delivery of slatwall panels waits to be fitted.

The first slatwall panels start turning the frame into a display wall.
04527 Jul 2016

The first slatwall panels start turning the frame into a display wall.

Display panels advance across the next section.
04627 Jul 2016

Display panels advance across the next section.

More panels join up around the corner.
04727 Jul 2016

More panels join up around the corner.

The slatwall corner is nearly complete.
04828 Jul 2016

The slatwall corner is nearly complete.

Lighting is fitted above the new display area.
04929 Jul 2016

Lighting is fitted above the new display area.

The first stock begins to appear on the display wall.
05029 Jul 2016

The first stock begins to appear on the display wall.

Stock spreads across more of the new display.
05129 Jul 2016

Stock spreads across more of the new display.

The stocked retail corner is taking shape in early August.
0524 Aug 2016

The stocked retail corner is taking shape in early August.

A later August view shows the display filled out with accessories.
05325 Aug 2016

A later August view shows the display filled out with accessories.

04Extending the fitout and building the timber ceiling — September–November 2016

A bare wall records the next section before its new frame is installed.
0543 Sep 2016

A bare wall records the next section before its new frame is installed.

A rectangular timber frame is assembled flat on the floor.
0553 Sep 2016

A rectangular timber frame is assembled flat on the floor.

More of the wall frame is put together at floor level.
0563 Sep 2016

More of the wall frame is put together at floor level.

The frame is raised into position against the wall.
0574 Sep 2016

The frame is raised into position against the wall.

Timber framing extends down the longer wall.
0588 Sep 2016

Timber framing extends down the longer wall.

A cross-wall opening takes shape within the frame.
0598 Sep 2016

A cross-wall opening takes shape within the frame.

An elevated view shows the footprint of the new framed area.
0608 Sep 2016

An elevated view shows the footprint of the new framed area.

Horizontal timber members are added between the wall studs.
06110 Sep 2016

Horizontal timber members are added between the wall studs.

Insulation starts filling the lower wall sections.
06211 Sep 2016

Insulation starts filling the lower wall sections.

More wall bays are filled with insulation.
06313 Sep 2016

More wall bays are filled with insulation.

Black membrane begins covering the new wall.
0641 Oct 2016

Black membrane begins covering the new wall.

Framing continues above the lower wall sections.
0651 Oct 2016

Framing continues above the lower wall sections.

Insulation reaches the upper corner of the wall.
0661 Oct 2016

Insulation reaches the upper corner of the wall.

Ceiling joists start bridging the space.
0671 Oct 2016

Ceiling joists start bridging the space.

Joists now span the length of the area.
0682 Oct 2016

Joists now span the length of the area.

The retail corner is seen beneath the new overhead framing.
0692 Oct 2016

The retail corner is seen beneath the new overhead framing.

From above, the ceiling battens form a grid ready for lining.
0703 Oct 2016

From above, the ceiling battens form a grid ready for lining.

The same ceiling structure is visible from below.
0713 Oct 2016

The same ceiling structure is visible from below.

Timber boards start covering the ceiling structure.
07215 Oct 2016

Timber boards start covering the ceiling structure.

The timber lining extends farther across the ceiling.
07315 Oct 2016

The timber lining extends farther across the ceiling.

Lights are fitted into the new timber ceiling.
07416 Oct 2016

Lights are fitted into the new timber ceiling.

A beam is painted beneath the finished timber lining.
07518 Oct 2016

A beam is painted beneath the finished timber lining.

Protective sheeting covers the room during painting.
07618 Oct 2016

Protective sheeting covers the room during painting.

Painting progresses along the overhead beams.
07719 Oct 2016

Painting progresses along the overhead beams.

Dark-painted beams frame the new ceiling and display walls.
07820 Oct 2016

Dark-painted beams frame the new ceiling and display walls.

The electrical distribution panel is shown during the finishing work.
07921 Oct 2016

The electrical distribution panel is shown during the finishing work.

The panel area is masked while the surrounding finish is completed.
08022 Oct 2016

The panel area is masked while the surrounding finish is completed.

White upper trim is added around the display walls.
08123 Oct 2016

White upper trim is added around the display walls.

The finished display wall is ready to receive stock.
08225 Oct 2016

The finished display wall is ready to receive stock.

Stock begins filling the completed wall.
08326 Oct 2016

Stock begins filling the completed wall.

An evening view through the entrance shows the stocked displays.
08426 Oct 2016

An evening view through the entrance shows the stocked displays.

A close view records the completed timber ceiling and lights.
08526 Oct 2016

A close view records the completed timber ceiling and lights.

An adjacent area still has exposed insulation and framing.
08629 Oct 2016

An adjacent area still has exposed insulation and framing.

A wide view records the stocked retail displays at the end of October.
08729 Oct 2016

A wide view records the stocked retail displays at the end of October.

The shopfront in daylight with its signs and Saturday-hours notices.
0881 Nov 2016

The shopfront in daylight with its signs and Saturday-hours notices.

A wide view brings the finished retail fitout together.
0891 Nov 2016

A wide view brings the finished retail fitout together.

05Lining, painting and services for the workshop — May–June 2017

The orange Computer Repairs sign appears in the photographic record in May.
09023 May 2017

The orange Computer Repairs sign appears in the photographic record in May.

The next workshop phase begins with insulation and services still exposed.
09110 Jun 2017

The next workshop phase begins with insulation and services still exposed.

A closer view records the insulation and services before they are covered.
09210 Jun 2017

A closer view records the insulation and services before they are covered.

Ceiling sheets are fitted overhead.
09310 Jun 2017

Ceiling sheets are fitted overhead.

The ceiling is covered while the walls remain unfinished.
09410 Jun 2017

The ceiling is covered while the walls remain unfinished.

The wall lining is measured and fitted around the remaining exposed insulation.
09510 Jun 2017

The wall lining is measured and fitted around the remaining exposed insulation.

Wall panels now cover most of the room.
09610 Jun 2017

Wall panels now cover most of the room.

Joint finishing begins between the wall sheets.
09710 Jun 2017

Joint finishing begins between the wall sheets.

The lined room shows the pattern of freshly filled joints.
09810 Jun 2017

The lined room shows the pattern of freshly filled joints.

Wall preparation continues the following day.
09911 Jun 2017

Wall preparation continues the following day.

An above-ceiling view records the insulation before the space is closed up.
10011 Jun 2017

An above-ceiling view records the insulation before the space is closed up.

The filled joints and doorway edges are prepared for painting.
10112 Jun 2017

The filled joints and doorway edges are prepared for painting.

White paint starts covering the prepared wall.
10212 Jun 2017

White paint starts covering the prepared wall.

The reverse view shows paintwork still progressing around the room.
10312 Jun 2017

The reverse view shows paintwork still progressing around the room.

The room is now largely white, with services still to be finished.
10412 Jun 2017

The room is now largely white, with services still to be finished.

Painted walls and the timber doorframe mark the next stage.
10512 Jun 2017

Painted walls and the timber doorframe mark the next stage.

Service cables emerge along the wall where the benches will be fitted.
10614 Jun 2017

Service cables emerge along the wall where the benches will be fitted.

The workshop entrance is seen from the adjoining retail area.
10717 Jun 2017

The workshop entrance is seen from the adjoining retail area.

The painted door is fitted in place.
10818 Jun 2017

The painted door is fitted in place.

Air hoses and wall fittings begin equipping the empty room.
10918 Jun 2017

Air hoses and wall fittings begin equipping the empty room.

A screen is mounted above the sliding doors.
11018 Jun 2017

A screen is mounted above the sliding doors.

06Flooring, benches and workstations — June 2017

Materials are stacked ready for the bench installation.
11119 Jun 2017

Materials are stacked ready for the bench installation.

Flooring begins along the edge as the first cabinet bases are set out.
11219 Jun 2017

Flooring begins along the edge as the first cabinet bases are set out.

The first base units establish the bench layout.
11319 Jun 2017

The first base units establish the bench layout.

More base units extend the work area.
11419 Jun 2017

More base units extend the work area.

Cabinet bases now run along the workshop wall.
11519 Jun 2017

Cabinet bases now run along the workshop wall.

The floor advances around the fitted bases.
11619 Jun 2017

The floor advances around the fitted bases.

Timber framing is added across the cabinet row.
11719 Jun 2017

Timber framing is added across the cabinet row.

A perimeter benchtop is laid in place.
11820 Jun 2017

A perimeter benchtop is laid in place.

The central island starts with another run of base units.
11921 Jun 2017

The central island starts with another run of base units.

Dark benchtop sections are fitted to the island.
12021 Jun 2017

Dark benchtop sections are fitted to the island.

The full-length island top brings the central workspace together.
12122 Jun 2017

The full-length island top brings the central workspace together.

The perimeter bench and its power outlets are now in place.
12224 Jun 2017

The perimeter bench and its power outlets are now in place.

Dark bench covering is rolled out and cut to fit.
12324 Jun 2017

Dark bench covering is rolled out and cut to fit.

One benchtop is prepared for its covering while the island surface is already in place.
12424 Jun 2017

One benchtop is prepared for its covering while the island surface is already in place.

The workshop's long bench surfaces are nearly complete.
12525 Jun 2017

The workshop's long bench surfaces are nearly complete.

Wiring and equipment begin filling the bench stations.
12625 Jun 2017

Wiring and equipment begin filling the bench stations.

Monitors are installed along the wall.
12725 Jun 2017

Monitors are installed along the wall.

The workstations are nearly ready for use.
12827 Jun 2017

The workstations are nearly ready for use.

Hanging leads and fitted benches complete the main workshop layout.
12929 Jun 2017

Hanging leads and fitted benches complete the main workshop layout.

07The sign and the finished workshop — July 2017

An above-ceiling view records further work at the start of July.
1301 Jul 2017

An above-ceiling view records further work at the start of July.

The orange sign is installed above the shopfront, with ladders still in place.
1312 Jul 2017

The orange sign is installed above the shopfront, with ladders still in place.

A wider evening view puts the Mitchell shopfront in its row of units.
1322 Jul 2017

A wider evening view puts the Mitchell shopfront in its row of units.

The completed frontage is illuminated after dark.
1332 Jul 2017

The completed frontage is illuminated after dark.

The fitted workshop is photographed with its benches and equipment in place.
1342 Jul 2017

The fitted workshop is photographed with its benches and equipment in place.

A final view along the long bench row records the completed workstations.
1353 Jul 2017

A final view along the long bench row records the completed workstations.

The illuminated exit sign records another detail of the finished fitout.
1368 Jul 2017

The illuminated exit sign records another detail of the finished fitout.

From an empty space to a place to work.

Back to this chapter →Back to the top ↑
CrawfordsComputer Services

Practical computer help.
A local shop. People you can talk to.

Visit our Greenway shop

Shop 39, 150 Soward Way
Greenway ACT 2900

Contact & directions ↗

Call or drop in

02 6112 8380

Monday–Saturday, 10am–3pm
Home and business visits by appointment

Full opening hours →
© 2026 Crawfords Computer ServicesVisitors to this page: 69
WebmailDownloads
Cart0